Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
GEG (Building Modernisation Act)
/
New measure
New measure
Title (English)
Title (German)
Obligations
Construct a building as a zero-emission building
Insulate the top storey ceiling of an existing building
Comply with the maximum thermal transmittance values when altering external building elements
Comply with the requirements of the chosen option when replacing or installing a heating system
From 1 January 2029 generate at least 10 % of the heat from climate-neutral fuels
From 1 January 2030 generate at least 15 % of the heat from climate-neutral fuels
From 1 January 2035 generate at least 30 % of the heat from climate-neutral fuels
From 1 January 2040 generate at least 60 % of the heat from climate-neutral fuels
Equip non-residential buildings with building automation and control and with automatic lighting controls
Keep heating, cooling and ventilation systems operational, operate them properly and maintain and service them
Have heat pumps checked in operation and optimise the system
Have older heating systems checked and optimised
Hydronically balance the heating system after a heating system has been installed
Have air conditioning and combined systems up to 70 kilowatts inspected for energy performance every ten years
From 2027 have air conditioning and ventilation systems above 70 kilowatts inspected every five years
Draw up, sign and hand over the inspection report to the operator
Have an energy performance certificate issued
Present, hand over and display the energy performance certificate and state the mandatory information in property advertisements
Submit the declaration of compliance for buildings to be constructed and for altered buildings
Issue the contractor declaration after completion of the works
Retain evidence and present it to the competent authority on request
Comply with the equipment requirements when installing or replacing heating, cooling and ventilation systems
Design a building to be constructed for the use of solar energy
Install a solar energy installation on an existing public non-residential building
Limit the total energy performance of an existing non-residential building to 3.5 times the reference building from 2030
Limit the total energy performance of an existing non-residential building to 2.95 times the reference building from 2033
Furnish evidence of the total energy performance of an existing non-residential building on request
Determine the life-cycle greenhouse gas emissions of a new building with more than 1 000 square metres of useful floor area and set them out in the life-cycle greenhouse gas balance report
Install a solar energy installation on a non-residential building to be constructed
Install a solar energy installation on an existing non-residential building above 500 square metres when it is altered
Install a solar energy installation on a new residential building or a new roofed car park
Determine the life-cycle greenhouse gas emissions of every new building and set them out in the life-cycle greenhouse gas balance report
Description (English)
Description (German)
Due date
Cancel