Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
GEG (Building Modernisation Act)
/
Edit obligation
Edit obligation
Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
Whoever constructs a building
Owners of existing residential and non-residential buildings heated to at least 19 degrees Celsius for at least four months a year
Existing buildings where external building elements are renewed, replaced or installed for the first time
Owners of existing buildings or building networks replacing the heating system
Existing buildings with a gas, heating oil or LPG heating system newly installed after 29 July 2026
Non-residential buildings with a system rated output above 70 kilowatts
Operators of heating, cooling and ventilation systems and hot water supply systems
Heat pumps in buildings with at least six dwellings or self-contained units, commissioned after 31 December 2023, without remote monitoring and without a maintenance contract
Water-based heating systems in buildings with at least six dwellings or self-contained units
Water-based heating systems after installation of a heating system in buildings with at least six dwellings
Operators of air conditioning systems and combined air conditioning and ventilation systems with more than 12 and up to 70 kilowatts of cooling output
Operators of air conditioning, combined air conditioning and ventilation and ventilation systems above 70 kilowatts
Developers and owners on construction, alteration, sale and letting
Sellers, landlords, lessors, financial lessors and estate agents
Developers and owners of buildings to be constructed and of altered buildings
Companies carrying out works on or in existing buildings in the course of business
Inspecting persons
Building owners holding a contractor declaration
Buildings where distribution equipment, air conditioning systems, ventilation systems or pipes are installed or replaced
Buildings to be constructed, except buildings serving national and alliance defence
New non-residential buildings with more than 250 square metres of useful floor area
Existing non-residential buildings above 500 square metres of useful floor area undergoing alterations of external building elements
Existing public non-residential buildings above 2 000 square metres of useful floor area
Existing public non-residential buildings above 750 square metres of useful floor area
New residential buildings and new roofed car parks
Existing public non-residential buildings above 250 square metres of useful floor area
Owners of existing non-residential buildings built before 1996 without biomass, heat pump or district heating
Owners of existing non-residential buildings
New buildings above 1 000 square metres of useful floor area
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
Where a heating system fired with gas, heating oil or LPG is newly installed in an existing building after 29 July 2026, the owner must ensure that from 1. Januar 2040 at least 60 % of the heat supplied by the system is generated from biomethane, bio-oil, biogenic LPG or green, blue, orange or turquoise hydrogen including derivatives. This step is recorded as a separate obligation because one obligation revision can carry only one application date and one rule set; the other steps — 10 % from 2029, 15 % from 2030, 30 % from 2035 and 60 % from 2040 — sit alongside it as separate obligations. Compliance options: the obligation may also be met by using a solar thermal system; between 1 January 2029 and 31 December 2034 it is deemed met where the system has at least 0.04 m² of aperture area per square metre of useful floor area in residential buildings with up to two dwellings and at least 0.03 m² in residential buildings with more than two dwellings. It may equally be met by a ventilation system with heat recovery where the heat recovery rate is at least 73 %, the coefficient of performance at least 10 and the system serves the entire floor area of the building. For a heat pump hybrid system the requirement is deemed met where the heat pump reaches at least 30 % of the peak load generator output at part load point A under DIN EN 14825, or at least 40 % in bivalent alternative operation. Anyone claiming a higher credited share must evidence it through an expert under Section 88 or a contractor declaration. Where biomethane or biogenic LPG is used, the requirements of Section 22(1), sentence 2, points 2 and 3 apply. Transitional rule: where the system is installed between 1 January 2028 and 31 December 2028 because of an irreparable failure of the existing heating, the obligation applies only twelve months after installation; from 1 January 2029 an obligation existing at the time of failure continues for twelve months. Where the owner is not the operator of the heating system, the operator must meet the obligation. Further references: Section 43(1) to (7), Section 22(1), Section 42a.
Description (German)
Wird eine Heizungsanlage, die mit Gas, Heizöl oder Flüssiggas beschickt wird, nach dem 29. Juli 2026 in ein bestehendes Gebäude neu eingebaut, hat der Eigentümer sicherzustellen, dass ab dem 1. Januar 2040 mindestens 60 Prozent der mit der Anlage bereitgestellten Wärme aus Biomethan, Bioöl, biogenem Flüssiggas oder grünem, blauem, orangenem oder türkisem Wasserstoff einschließlich daraus hergestellter Derivate erzeugt wird. Diese Stufe ist als eigene Pflicht erfasst, weil eine Pflichtfassung nur einen Anwendungsbeginn und ein Regelwerk tragen kann; die übrigen Stufen — 10 Prozent ab 2029, 15 Prozent ab 2030, 30 Prozent ab 2035 und 60 Prozent ab 2040 — stehen als eigene Pflichten daneben. Erfüllungsoptionen: Die Pflicht kann auch durch die Nutzung einer solarthermischen Anlage erfüllt werden; im Zeitraum vom 1. Januar 2029 bis zum 31. Dezember 2034 gilt sie als erfüllt, wenn die Anlage bei Wohngebäuden mit höchstens zwei Wohnungen mindestens 0,04 und bei Wohngebäuden mit mehr als zwei Wohnungen mindestens 0,03 Quadratmeter Aperturfläche je Quadratmeter Nutzfläche hat. Ebenso kann sie durch eine raumlufttechnische Anlage mit Wärmerückgewinnung erfüllt werden, wenn der Wärmerückgewinnungsgrad mindestens 73 Prozent, die Leistungszahl mindestens 10 beträgt und die Anlage die gesamte Gebäudefläche versorgt. Bei einer Wärmepumpen-Hybridheizung gilt die Anforderung als erfüllt, wenn die Wärmepumpe beim Teillastpunkt A nach DIN EN 14825 mindestens 30 Prozent oder bei bivalent alternativem Betrieb mindestens 40 Prozent der Leistung des Spitzenlasterzeugers erreicht. Wer einen höheren Anrechnungsanteil geltend macht, hat ihn durch eine fachkundige Person nach § 88 oder eine Unternehmererklärung nachzuweisen. Bei Nutzung von Biomethan oder biogenem Flüssiggas sind die Anforderungen des § 22 Absatz 1 Satz 2 Nummer 2 bzw. 3 einzuhalten. Übergangsregelung: Wird die Anlage wegen eines irreparablen Ausfalls der bestehenden Heizung zwischen dem 1. Januar 2028 und dem 31. Dezember 2028 eingebaut, gilt die Pflicht erst zwölf Monate nach dem Einbau; ab dem 1. Januar 2029 gilt eine zum Ausfallzeitpunkt bestehende Pflicht zwölf Monate fort. Ist der Eigentümer nicht der Betreiber der Heizungsanlage, ist die Pflicht durch den Betreiber zu erfüllen. Weitere Fundstellen: § 43 Absätze 1 bis 7, § 22 Absatz 1, § 42a.
Affected products/services (English)
Heating systems fired with gas, heating oil or LPG in the company’s existing buildings and the fuels purchased for them.
Affected products/services (German)
Mit Gas, Heizöl oder Flüssiggas beschickte Heizungsanlagen in bestehenden Gebäuden des Unternehmens sowie die dafür bezogenen Brennstoffe.
Checking responsibility (English)
Building owner, or the operator of the heating system where they differ; operationally energy procurement together with facility management.
Checking responsibility (German)
Gebäudeeigentümer, bei abweichendem Betrieb der Betreiber der Heizungsanlage; operativ der Energieeinkauf gemeinsam mit dem Facility Management.
Check method (English)
Reconciliation of fuel invoices and guarantees of origin per system with the minimum share applicable to the relevant period.
Check method (German)
Abgleich der Brennstoffabrechnungen und Herkunftsnachweise je Anlage mit dem für den jeweiligen Zeitraum geltenden Mindestanteil.
Withdrawn at
Cancel
Delete this obligation