Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
GEG (Building Modernisation Act)
/
Edit obligation
Edit obligation
Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
Whoever constructs a building
Owners of existing residential and non-residential buildings heated to at least 19 degrees Celsius for at least four months a year
Existing buildings where external building elements are renewed, replaced or installed for the first time
Owners of existing buildings or building networks replacing the heating system
Existing buildings with a gas, heating oil or LPG heating system newly installed after 29 July 2026
Non-residential buildings with a system rated output above 70 kilowatts
Operators of heating, cooling and ventilation systems and hot water supply systems
Heat pumps in buildings with at least six dwellings or self-contained units, commissioned after 31 December 2023, without remote monitoring and without a maintenance contract
Water-based heating systems in buildings with at least six dwellings or self-contained units
Water-based heating systems after installation of a heating system in buildings with at least six dwellings
Operators of air conditioning systems and combined air conditioning and ventilation systems with more than 12 and up to 70 kilowatts of cooling output
Operators of air conditioning, combined air conditioning and ventilation and ventilation systems above 70 kilowatts
Developers and owners on construction, alteration, sale and letting
Sellers, landlords, lessors, financial lessors and estate agents
Developers and owners of buildings to be constructed and of altered buildings
Companies carrying out works on or in existing buildings in the course of business
Inspecting persons
Building owners holding a contractor declaration
Buildings where distribution equipment, air conditioning systems, ventilation systems or pipes are installed or replaced
Buildings to be constructed, except buildings serving national and alliance defence
New non-residential buildings with more than 250 square metres of useful floor area
Existing non-residential buildings above 500 square metres of useful floor area undergoing alterations of external building elements
Existing public non-residential buildings above 2 000 square metres of useful floor area
Existing public non-residential buildings above 750 square metres of useful floor area
New residential buildings and new roofed car parks
Existing public non-residential buildings above 250 square metres of useful floor area
Owners of existing non-residential buildings built before 1996 without biomass, heat pump or district heating
Owners of existing non-residential buildings
New buildings above 1 000 square metres of useful floor area
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
A water-based heating system must be hydronically balanced after a heating system has been installed for commissioning in buildings with at least six dwellings or other self-contained units. Taking account of all essential components, hydronic balancing comprises at least a room-by-room heat load calculation under DIN EN 12831 Part 1 in conjunction with DIN/TS 12831 Part 1, examination and where necessary optimisation of the heating surfaces with a view to the lowest possible flow temperature, and adjustment of the flow temperature control. It must be carried out under method B of the ZVSHK technical rule on optimising existing heating systems or an equivalent method. The confirmation of hydronic balancing must be recorded in writing, including the setting values, the heat load of the building, the set output of the heat generators, the room-by-room heat load calculation, the design temperature, the control settings and the pressure in the expansion vessel, and communicated to the responsible person; on request it must be presented to the tenant without delay. Further references: Section 60c(1) to (4), Section 108(1), point 11.
Description (German)
Ein Heizungssystem mit Wasser als Wärmeträger ist nach dem Einbau oder der Aufstellung einer Heizungsanlage zum Zweck der Inbetriebnahme in Gebäuden mit mindestens sechs Wohnungen oder sonstigen selbständigen Nutzungseinheiten hydraulisch abzugleichen. Der hydraulische Abgleich umfasst unter Berücksichtigung aller wesentlichen Komponenten mindestens eine raumweise Heizlastberechnung nach DIN EN 12831 Teil 1 in Verbindung mit DIN/TS 12831 Teil 1, die Prüfung und nötigenfalls Optimierung der Heizflächen im Hinblick auf eine möglichst niedrige Vorlauftemperatur und die Anpassung der Vorlauftemperaturregelung. Er ist nach dem Verfahren B der ZVSHK-Fachregel „Optimierung von Heizungsanlagen im Bestand“ oder einem gleichwertigen Verfahren durchzuführen. Die Bestätigung des hydraulischen Abgleichs ist einschließlich der Einstellungswerte, der Heizlast des Gebäudes, der eingestellten Leistung der Wärmeerzeuger, der raumweisen Heizlastberechnung, der Auslegungstemperatur, der Einstellung der Regelung und des Drucks im Ausdehnungsgefäß schriftlich festzuhalten und dem Verantwortlichen mitzuteilen; auf Verlangen ist sie dem Mieter unverzüglich vorzulegen. Weitere Fundstellen: § 60c Absätze 1 bis 4, § 108 Absatz 1 Nummer 11.
Affected products/services (English)
Water-based heating systems in the company’s buildings with at least six dwellings or self-contained units.
Affected products/services (German)
Heizungssysteme mit Wasser als Wärmeträger in Gebäuden des Unternehmens mit mindestens sechs Wohnungen oder selbständigen Nutzungseinheiten.
Checking responsibility (English)
Operator of the system together with the heating contractor.
Checking responsibility (German)
Betreiber der Anlage gemeinsam mit dem ausführenden Heizungsbauunternehmen.
Check method (English)
Presence of the written confirmation of hydronic balancing with the information required under Section 60c(4).
Check method (German)
Vorliegen der schriftlichen Bestätigung des hydraulischen Abgleichs mit den nach § 60c Absatz 4 geforderten Angaben.
Withdrawn at
Cancel
Delete this obligation