Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
Whoever constructs a building
Owners of existing residential and non-residential buildings heated to at least 19 degrees Celsius for at least four months a year
Existing buildings where external building elements are renewed, replaced or installed for the first time
Owners of existing buildings or building networks replacing the heating system
Existing buildings with a gas, heating oil or LPG heating system newly installed after 29 July 2026
Non-residential buildings with a system rated output above 70 kilowatts
Operators of heating, cooling and ventilation systems and hot water supply systems
Heat pumps in buildings with at least six dwellings or self-contained units, commissioned after 31 December 2023, without remote monitoring and without a maintenance contract
Water-based heating systems in buildings with at least six dwellings or self-contained units
Water-based heating systems after installation of a heating system in buildings with at least six dwellings
Operators of air conditioning systems and combined air conditioning and ventilation systems with more than 12 and up to 70 kilowatts of cooling output
Operators of air conditioning, combined air conditioning and ventilation and ventilation systems above 70 kilowatts
Developers and owners on construction, alteration, sale and letting
Sellers, landlords, lessors, financial lessors and estate agents
Developers and owners of buildings to be constructed and of altered buildings
Companies carrying out works on or in existing buildings in the course of business
Inspecting persons
Building owners holding a contractor declaration
Buildings where distribution equipment, air conditioning systems, ventilation systems or pipes are installed or replaced
Buildings to be constructed, except buildings serving national and alliance defence
New non-residential buildings with more than 250 square metres of useful floor area
Existing non-residential buildings above 500 square metres of useful floor area undergoing alterations of external building elements
Existing public non-residential buildings above 2 000 square metres of useful floor area
Existing public non-residential buildings above 750 square metres of useful floor area
New residential buildings and new roofed car parks
Existing public non-residential buildings above 250 square metres of useful floor area
Owners of existing non-residential buildings built before 1996 without biomass, heat pump or district heating
Owners of existing non-residential buildings
New buildings above 1 000 square metres of useful floor area
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
A solar energy installation must be installed on an existing public non-residential building. The group of buildings concerned widens in three stages, each of which supersedes the previous one: - from 1 January 2028 on an existing public non-residential building with more than 2 000 square metres of useful floor area; - from 1 January 2029 on an existing public non-residential building with more than 750 square metres of useful floor area; - from 1 January 2031 on an existing public non-residential building with more than 250 square metres of useful floor area. Because each stage supersedes the previous one, no single rule set is attached to this obligation; the group of addressees is described here instead. The useful floor area threshold is therefore not available as a filter. The solar obligation for non-residential buildings to be constructed (from 1 January 2027), for existing non-residential buildings with more than 500 square metres of useful floor area undergoing alterations within the meaning of Section 36 (from 1 January 2028) and for new residential buildings and new roofed car parks (from 1 January 2030) is covered by separate obligations, each with its own rule set. The duty does not apply where installing a solar energy installation is technically impossible, functionally not feasible or economically unreasonable, or where it conflicts with other public-law provisions; nor where measures under Section 40(1) have to be taken for the building; nor to buildings serving national and alliance defence. The Länder may impose stricter requirements. Further references: Section 106(2) to (5) as in force from 1 January 2027.
Description (German)
Auf einem bestehenden öffentlichen Nichtwohngebäude ist eine Solarenergieanlage zu errichten. Der Adressatenkreis wächst in drei Stufen, von denen jede die vorangegangene ablöst: - ab dem 1. Januar 2028 auf einem bestehenden öffentlichen Nichtwohngebäude mit einer Nutzfläche von mehr als 2 000 Quadratmetern; - ab dem 1. Januar 2029 auf einem bestehenden öffentlichen Nichtwohngebäude mit einer Nutzfläche von mehr als 750 Quadratmetern; - ab dem 1. Januar 2031 auf einem bestehenden öffentlichen Nichtwohngebäude mit einer Nutzfläche von mehr als 250 Quadratmetern. Weil jede Stufe die vorangegangene ablöst, ist dieser Pflicht kein einzelnes Regelwerk zugeordnet; der Adressatenkreis ist stattdessen hier beschrieben. Die Flächenschwelle steht deshalb nicht als Filter zur Verfügung. Die Solarpflicht für zu errichtende Nichtwohngebäude (ab dem 1. Januar 2027), für bestehende Nichtwohngebäude mit mehr als 500 Quadratmetern Nutzfläche bei Änderungen im Sinne des § 36 (ab dem 1. Januar 2028) sowie für neue Wohngebäude und neue überdachte Parkplätze (ab dem 1. Januar 2030) ist in eigenen Pflichten mit jeweils eigenem Regelwerk erfasst. Die Pflicht entfällt, soweit die Errichtung einer Solarenergieanlage technisch unmöglich, funktional nicht realisierbar oder wirtschaftlich unzumutbar ist oder anderen öffentlich-rechtlichen Vorschriften widerspricht; ferner, wenn für das Gebäude Maßnahmen nach § 40 Absatz 1 zu ergreifen sind, und für Gebäude, die der Landes- und Bündnisverteidigung dienen. Die Länder können weitergehende Anforderungen stellen. Weitere Fundstellen: § 106 Absätze 2 bis 5 in der ab 1. Januar 2027 geltenden Fassung.
Affected products/services (English)
Existing public non-residential buildings of the company: above 2 000 square metres from 2028, above 750 square metres from 2029, above 250 square metres from 2031.
Affected products/services (German)
Bestehende öffentliche Nichtwohngebäude des Unternehmens: ab 2028 über 2 000 Quadratmeter, ab 2029 über 750 Quadratmeter, ab 2031 über 250 Quadratmeter Nutzfläche.
Checking responsibility (English)
Developer or owner under Section 8; operationally construction and real estate management with the design team.
Checking responsibility (German)
Bauherr oder Eigentümer nach § 8; operativ Bau- und Immobilienmanagement gemeinsam mit der Fachplanung.
Check method (English)
Register of existing public non-residential buildings with their useful floor area, matched against the three stages; evidence of installed solar capacity or of a documented exemption.
Check method (German)
Verzeichnis der bestehenden öffentlichen Nichtwohngebäude mit ihrer Nutzfläche, abgeglichen mit den drei Stufen; Nachweis der errichteten Solarenergieanlage oder der dokumentierten Ausnahme.
Withdrawn at