Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
GEG (Building Modernisation Act)
/
Edit obligation
Edit obligation
Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
Whoever constructs a building
Owners of existing residential and non-residential buildings heated to at least 19 degrees Celsius for at least four months a year
Existing buildings where external building elements are renewed, replaced or installed for the first time
Owners of existing buildings or building networks replacing the heating system
Existing buildings with a gas, heating oil or LPG heating system newly installed after 29 July 2026
Non-residential buildings with a system rated output above 70 kilowatts
Operators of heating, cooling and ventilation systems and hot water supply systems
Heat pumps in buildings with at least six dwellings or self-contained units, commissioned after 31 December 2023, without remote monitoring and without a maintenance contract
Water-based heating systems in buildings with at least six dwellings or self-contained units
Water-based heating systems after installation of a heating system in buildings with at least six dwellings
Operators of air conditioning systems and combined air conditioning and ventilation systems with more than 12 and up to 70 kilowatts of cooling output
Operators of air conditioning, combined air conditioning and ventilation and ventilation systems above 70 kilowatts
Developers and owners on construction, alteration, sale and letting
Sellers, landlords, lessors, financial lessors and estate agents
Developers and owners of buildings to be constructed and of altered buildings
Companies carrying out works on or in existing buildings in the course of business
Inspecting persons
Building owners holding a contractor declaration
Buildings where distribution equipment, air conditioning systems, ventilation systems or pipes are installed or replaced
Buildings to be constructed, except buildings serving national and alliance defence
New non-residential buildings with more than 250 square metres of useful floor area
Existing non-residential buildings above 500 square metres of useful floor area undergoing alterations of external building elements
Existing public non-residential buildings above 2 000 square metres of useful floor area
Existing public non-residential buildings above 750 square metres of useful floor area
New residential buildings and new roofed car parks
Existing public non-residential buildings above 250 square metres of useful floor area
Owners of existing non-residential buildings built before 1996 without biomass, heat pump or district heating
Owners of existing non-residential buildings
New buildings above 1 000 square metres of useful floor area
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
From 1 January 2030 a solar energy installation must be installed on a new residential building and on a new roofed car park that is physically adjacent to a building. The duty is triggered by the construction project and does not expire. The duty does not apply where installing a solar energy installation is technically impossible, functionally not feasible or economically unreasonable, or where it conflicts with other public-law provisions; nor where measures under Section 40(1) have to be taken for the building; nor to buildings serving national and alliance defence. The Länder may impose stricter requirements. Further references: Section 106(2) to (5) as in force from 1 January 2027.
Description (German)
Ab dem 1. Januar 2030 ist eine Solarenergieanlage auf einem neuen Wohngebäude und auf einem neuen überdachten Parkplatz, der physisch an ein Gebäude angrenzt, zu errichten. Die Pflicht wird durch das Bauvorhaben ausgelöst und läuft nicht aus. Die Pflicht entfällt, soweit die Errichtung einer Solarenergieanlage technisch unmöglich, funktional nicht realisierbar oder wirtschaftlich unzumutbar ist oder anderen öffentlich-rechtlichen Vorschriften widerspricht; ferner, wenn für das Gebäude Maßnahmen nach § 40 Absatz 1 zu ergreifen sind, und für Gebäude, die der Landes- und Bündnisverteidigung dienen. Die Länder können weitergehende Anforderungen stellen. Weitere Fundstellen: § 106 Absätze 2 bis 5 in der ab 1. Januar 2027 geltenden Fassung.
Affected products/services (English)
Residential buildings and roofed car parks adjacent to a building newly constructed by the company from 1 January 2030.
Affected products/services (German)
Vom Unternehmen ab dem 1. Januar 2030 neu errichtete Wohngebäude und neue überdachte Parkplätze, die an ein Gebäude angrenzen.
Checking responsibility (English)
Developer or owner under Section 8; operationally construction and real estate management with the design team.
Checking responsibility (German)
Bauherr oder Eigentümer nach § 8; operativ Bau- und Immobilienmanagement gemeinsam mit der Fachplanung.
Check method (English)
Solar capacity documented in the design and building-permit documents, together with the declaration of compliance under Section 92, or a documented exemption.
Check method (German)
In der Entwurfs- und Genehmigungsplanung dokumentierte Solarenergieanlage, zusammen mit der Erfüllungserklärung nach § 92, oder eine dokumentierte Ausnahme.
Withdrawn at
Cancel
Delete this obligation