Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
GEG (Building Modernisation Act)
/
New obligation
New obligation
Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
Whoever constructs a building
Owners of existing residential and non-residential buildings heated to at least 19 degrees Celsius for at least four months a year
Existing buildings where external building elements are renewed, replaced or installed for the first time
Owners of existing buildings or building networks replacing the heating system
Existing buildings with a gas, heating oil or LPG heating system newly installed after 29 July 2026
Non-residential buildings with a system rated output above 70 kilowatts
Operators of heating, cooling and ventilation systems and hot water supply systems
Heat pumps in buildings with at least six dwellings or self-contained units, commissioned after 31 December 2023, without remote monitoring and without a maintenance contract
Water-based heating systems in buildings with at least six dwellings or self-contained units
Water-based heating systems after installation of a heating system in buildings with at least six dwellings
Operators of air conditioning systems and combined air conditioning and ventilation systems with more than 12 and up to 70 kilowatts of cooling output
Operators of air conditioning, combined air conditioning and ventilation and ventilation systems above 70 kilowatts
Developers and owners on construction, alteration, sale and letting
Sellers, landlords, lessors, financial lessors and estate agents
Developers and owners of buildings to be constructed and of altered buildings
Companies carrying out works on or in existing buildings in the course of business
Inspecting persons
Building owners holding a contractor declaration
Buildings where distribution equipment, air conditioning systems, ventilation systems or pipes are installed or replaced
Buildings to be constructed, except buildings serving national and alliance defence
New non-residential buildings with more than 250 square metres of useful floor area
Existing non-residential buildings above 500 square metres of useful floor area undergoing alterations of external building elements
Existing public non-residential buildings above 2 000 square metres of useful floor area
Existing public non-residential buildings above 750 square metres of useful floor area
New residential buildings and new roofed car parks
Existing public non-residential buildings above 250 square metres of useful floor area
Owners of existing non-residential buildings built before 1996 without biomass, heat pump or district heating
Owners of existing non-residential buildings
New buildings above 1 000 square metres of useful floor area
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
Description (German)
Affected products/services (English)
Affected products/services (German)
Checking responsibility (English)
Checking responsibility (German)
Check method (English)
Check method (German)
Withdrawn at
Cancel