Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
EPBD
/
Edit obligation
Edit obligation
Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
New buildings owned by public bodies
New buildings
New buildings with more than 1 000 m² of useful floor area
Existing buildings undergoing a major renovation, and building elements retrofitted or replaced
Non-residential buildings
New non-residential buildings with more than 250 m² of total useful floor area
Existing non-residential buildings with more than 500 m² of total useful floor area undergoing a major renovation or a measure requiring a permit
New residential buildings and new covered car parks physically adjacent to buildings
New non-residential buildings and non-residential buildings undergoing a major renovation with more than five car parking spaces
New residential buildings and residential buildings undergoing a major renovation with more than three car parking spaces
Non-residential buildings with more than 20 car parking spaces
Buildings with newly installed, replaced or upgraded technical building systems
Non-residential buildings with a system rated output above 290 kW
Non-residential buildings with a system rated output above 70 kW
Building owners on construction, major renovation, sale and letting
Sellers and landlords of buildings and building units
Heating, ventilation and air-conditioning systems with a rated output above 70 kW
Systems with generators whose rated output exceeds 290 kW
Experts inspecting heating, ventilation and air-conditioning systems
Non-residential buildings for which an energy performance certificate has been issued
Owners and tenants holding certificates, renovation passports, smart readiness indicators or inspection reports
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
All non-residential buildings with more than 20 car parking spaces must, by 1 January 2027, have at least one recharging point per ten car parking spaces or ducting infrastructure — conduits for electric cables — for at least 50 % of the car parking spaces, so that recharging points can be installed later. In addition, bicycle parking spaces representing at least 15 % of the average or at least 10 % of the total user capacity must be provided, with room for bicycles larger than standard ones. This obligation is recorded separately from the one on new construction and major renovation because it attaches to a fixed date in the existing stock rather than to a building project, and because it has a different parking threshold and a different equipment ratio. For buildings owned or used by public bodies, pre-cabling of at least 50 % of the spaces by 1 January 2033 is added. Member States may postpone implementation until 1 January 2029 for non-residential buildings renovated in the two years before 28 May 2024 to meet national requirements under Article 8(3) of Directive 2010/31/EU. The exemptions in Article 14(5) also apply here. The Directive is addressed to the Member States; the obligation only binds companies through national transposition law. Its wording requires the Member State to ensure a specific behaviour of building owners and is therefore recorded as a binding obligation of the owner. Further references: Article 14(2), (3), (5) and (6).
Description (German)
Alle Nichtwohngebäude mit mehr als 20 Autostellplätzen müssen bis zum 1. Januar 2027 mindestens einen Ladepunkt je zehn Autostellplätze oder eine Leitungsinfrastruktur — Schutzrohre für Elektrokabel — für mindestens 50 % der Autostellplätze haben, um die spätere Errichtung von Ladepunkten zu ermöglichen. Zusätzlich sind Fahrradstellplätze in Höhe von mindestens 15 % der durchschnittlichen oder mindestens 10 % der gesamten Nutzerkapazität bereitzustellen, mit Platz auch für Fahrräder mit größeren Abmessungen. Diese Pflicht ist von der Pflicht bei Neubau und größerer Renovierung getrennt erfasst, weil sie an einen festen Stichtag im Gebäudebestand anknüpft und nicht an ein Bauvorhaben, und weil sie eine andere Stellplatzschwelle und eine andere Ausstattungsquote hat. Für Gebäude im Eigentum oder in der Nutzung öffentlicher Einrichtungen kommt die Vorverkabelung von mindestens 50 % der Stellplätze bis zum 1. Januar 2033 hinzu. Die Mitgliedstaaten können die Umsetzung für Nichtwohngebäude, die in den zwei Jahren vor dem 28. Mai 2024 nach den nationalen Anforderungen zu Artikel 8 Absatz 3 der Richtlinie 2010/31/EU renoviert wurden, bis zum 1. Januar 2029 aufschieben. Die Ausnahmen des Artikels 14 Absatz 5 gelten auch hier. Die Richtlinie richtet sich an die Mitgliedstaaten; die Pflicht wirkt gegenüber Unternehmen erst über das nationale Umsetzungsrecht. Der Wortlaut verlangt vom Mitgliedstaat, ein bestimmtes Verhalten der Gebäudeeigentümer sicherzustellen, und ist deshalb als verbindliche Pflicht des Eigentümers erfasst. Weitere Fundstellen: Artikel 14 Absätze 2, 3, 5 und 6.
Affected products/services (English)
Car parks of the company’s existing non-residential buildings, the recharging infrastructure installed there and the bicycle parking spaces.
Affected products/services (German)
Parkplätze bestehender Nichtwohngebäude des Unternehmens, die dort errichtete Ladeinfrastruktur und die Fahrradstellplätze.
Checking responsibility (English)
Building owner; operationally real estate management together with electrical design.
Checking responsibility (German)
Gebäudeeigentümer; operativ Immobilienmanagement gemeinsam mit der Elektroplanung.
Check method (English)
Reconciliation of the recharging points installed or the ducting prepared per site with the number of parking spaces at the cut-off date of 1 January 2027.
Check method (German)
Abgleich der je Standort errichteten Ladepunkte oder der vorbereiteten Leitungsinfrastruktur mit der Stellplatzzahl zum Stichtag 1. Januar 2027.
Withdrawn at
Cancel
Delete this obligation