Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
EED
/
Edit measure
Edit measure
Title (English)
Title (German)
Obligations
Implement and certify an energy management system
Have an energy audit carried out
Draw up an action plan from the audit recommendations and submit it to management
Set out the action plan and the implementation rate in the annual report and make them publicly available
Make the exceedance of the consumption threshold available to the competent national authorities
Publish the energy performance information of the data centre annually
Procure only highly energy-efficient products, services, buildings and works above the procurement thresholds
Draw up a plan for more efficient operation of the district heating or cooling system and have it approved
Carry out a cost-benefit analysis at installation level
Monitor and quantify network losses and report them to the regulatory authority
Use the waste heat of the data centre
Comply with the Annex XIV requirements on connection rules and connection procedures
Assess long-term energy performance contracts when awarding energy-relevant service contracts
Publish the impact of the contract on energy efficiency in the TED notice
Description (English)
The audit follows the minimum criteria of Annex VI: up-to-date, measured and verifiable operating data on energy consumption and load profiles, a detailed review of the energy consumption profile of buildings, operations and installations including transport, life-cycle cost analysis instead of simple payback periods, and proportionate and representative data.
Description (German)
Das Audit folgt den Mindestkriterien des Anhangs VI: aktuelle, gemessene und belegbare Betriebsdaten zum Energieverbrauch und zu den Lastprofilen, eine detaillierte Untersuchung des Energieverbrauchsprofils von Gebäuden, Betriebsabläufen und Anlagen einschließlich Verkehr, eine Lebenszykluskostenrechnung statt einer einfachen Amortisationsrechnung sowie verhältnismäßige und repräsentative Datengrundlagen.
Due date
Cancel
Delete this measure