Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
EED
/
Edit obligation
Edit obligation
Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
Companies with an average annual energy consumption of more than 85 TJ
Companies with an average annual energy consumption of more than 10 TJ without an energy management system
Owners and operators of data centres with an installed IT power demand of at least 500 kW
Contracting authorities and contracting entities for contracts above the procurement thresholds
Operators of existing district heating and cooling systems with an output of more than 5 MW that do not meet the efficiency criteria
Installations that are newly planned or substantially refurbished and exceed the energy input thresholds
Transmission and distribution system operators
Companies with an average annual energy consumption of more than 10 TJ
Data centres with a nominal total energy input of more than 1 MW
Electricity transmission and distribution system operators
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
When awarding public contracts and concessions above the EU procurement thresholds, the contracting authority or entity procures only products, services, buildings and works with high energy-efficiency performance in accordance with the Directive's procurement requirements, unless this is not technically feasible. The corrigenda of 3 October 2025 and 7 November 2025 corrected this proviso in the German language version. In addition, for those contracts the contracting authority or entity applies the energy efficiency first principle, including where the Directive lays down no specific procurement requirements. The obligation does not apply where it would undermine public security or impede the response to public health emergencies; it applies only to a limited extent to contracts of the armed forces and not to the supply of military equipment. The Directive is formally addressed to the Member States; the obligation recorded here reaches the company only through national transposing law, which had to be in force by 11 October 2025.
Description (German)
Bei der Vergabe öffentlicher Aufträge und Konzessionen oberhalb der unionsrechtlichen Vergabeschwellenwerte beschafft der Auftraggeber nur Produkte, Dienstleistungen, Gebäude und Bauleistungen mit hoher Energieeffizienz nach den Beschaffungsanforderungen der Richtlinie, es sei denn, dies ist technisch nicht durchführbar. Die Berichtigungen vom 3. Oktober 2025 und vom 7. November 2025 haben diese Rückausnahme in der deutschen Sprachfassung richtiggestellt. Zusätzlich wendet der Auftraggeber bei diesen Aufträgen den Grundsatz „Energieeffizienz an erster Stelle“ an, auch dort, wo die Richtlinie keine besonderen Beschaffungsanforderungen vorsieht. Die Pflicht gilt nicht, soweit sie die öffentliche Sicherheit untergraben oder die Reaktion auf Notlagen der öffentlichen Gesundheit beeinträchtigen würde; für Verträge der Streitkräfte gilt sie nur eingeschränkt und für die Lieferung von Militärausrüstung nicht. Die Richtlinie richtet sich förmlich an die Mitgliedstaaten; die hier erfasste Pflicht trifft das Unternehmen erst über das nationale Umsetzungsrecht, das bis zum 11. Oktober 2025 in Kraft zu setzen war.
Affected products/services (English)
Affected products/services (German)
Checking responsibility (English)
Procurement and the awarding unit, supported by energy management.
Checking responsibility (German)
Einkauf und Vergabestelle, fachlich unterstützt durch das Energiemanagement.
Check method (English)
Reconciliation of the tender documents against the requirements of Annex IV and documentation of the reasons where they are departed from.
Check method (German)
Abgleich der Vergabeunterlagen mit den Anforderungen des Anhangs IV und Dokumentation der Begründung, wenn davon abgewichen wird.
Withdrawn at
Cancel
Delete this obligation