Emtract Ingest
API
EN
EN
DE
Dashboard
Regulations
Crawlers
Attributes
Topics
Home
/
Regulations
/
EED
/
Edit obligation
Edit obligation
Title (English)
Title (German)
Kind
Approval
Due Diligence
Governance
Other
Record Keeping
Reporting
Stakeholder Engagement
Frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Check frequency
Annual
Biennial
Continuous
Event-triggered
Monthly
One-time
Other
Quarterly
Weekly
Rule set
Regulation-wide (no rule set)
Companies with an average annual energy consumption of more than 85 TJ
Companies with an average annual energy consumption of more than 10 TJ without an energy management system
Owners and operators of data centres with an installed IT power demand of at least 500 kW
Contracting authorities and contracting entities for contracts above the procurement thresholds
Operators of existing district heating and cooling systems with an output of more than 5 MW that do not meet the efficiency criteria
Installations that are newly planned or substantially refurbished and exceed the energy input thresholds
Transmission and distribution system operators
Companies with an average annual energy consumption of more than 10 TJ
Data centres with a nominal total energy input of more than 1 MW
Electricity transmission and distribution system operators
Complexity (0–5)
Business functions
Communications
Compliance
Executive
Finance
Human Resources
Legal
Operations
Other
Procurement
Product
Sales
Sustainability
Description (English)
The operator of an existing district heating or cooling system with a total output of more than 5 MW that does not meet the criteria of Article 26(1), points (b) to (e), draws up a plan to ensure more efficient use of primary energy, to reduce distribution losses and to increase the share of renewable energy. The plan sets out measures to meet those criteria and must be approved by the competent authority. The first plan is due from 1 January 2025, and every five years thereafter. The Directive is formally addressed to the Member States; the obligation recorded here reaches the company only through national transposing law, which had to be in force by 11 October 2025.
Description (German)
Der Betreiber eines bestehenden Fernwärme- oder Fernkältesystems mit einer Gesamtabgabe von mehr als 5 MW, das die Kriterien des Artikels 26 Absatz 1 Buchstaben b bis e nicht erfüllt, erstellt einen Plan zur Gewährleistung eines effizienteren Verbrauchs von Primärenergie, zur Reduzierung von Verteilungsverlusten und zur Steigerung des Anteils erneuerbarer Energien. Der Plan enthält Maßnahmen zur Erfüllung dieser Kriterien und muss von der zuständigen Behörde genehmigt werden. Der erste Plan ist ab dem 1. Januar 2025 fällig, danach alle fünf Jahre. Die Richtlinie richtet sich förmlich an die Mitgliedstaaten; die hier erfasste Pflicht trifft das Unternehmen erst über das nationale Umsetzungsrecht, das bis zum 11. Oktober 2025 in Kraft zu setzen war.
Affected products/services (English)
Affected products/services (German)
Checking responsibility (English)
Operational management of the district heating or cooling system.
Checking responsibility (German)
Betriebsleitung des Fernwärme- oder Fernkältesystems.
Check method (English)
Existence of the plan approved by the authority and reconciliation against the criteria of Article 26(1), points (b) to (e).
Check method (German)
Vorliegen des behördlich genehmigten Plans und Abgleich mit den Kriterien des Artikels 26 Absatz 1 Buchstaben b bis e.
Withdrawn at
Cancel
Delete this obligation