EnEfG
/
Edit penalty
Edit penalty
Description (English)
Administrative fine of up to fifty thousand euro for an intentional or negligent infringement in the other cases of Section 19(1): a missing, incorrect, incomplete or late implementation plan (point 2), a missing confirmation of the implementation plan (point 3), non-compliance with an enforceable order under Section 10, second sentence (point 4), missing or incorrect transmission of the data centre information (point 6), and missing or incorrect information and transmission regarding waste heat (points 8 and 9).
Description (German)
Geldbuße bis zu fünfzigtausend Euro für die vorsätzliche oder fahrlässige Ordnungswidrigkeit in den übrigen Fällen des § 19 Absatz 1: fehlender, fehlerhafter, unvollständiger oder verspäteter Umsetzungsplan (Nummer 2), fehlende Bestätigung des Umsetzungsplans (Nummer 3), Zuwiderhandlung gegen eine vollziehbare Anordnung nach § 10 Satz 2 (Nummer 4), fehlende oder fehlerhafte Übermittlung der Rechenzentrumsangaben (Nummer 6) sowie fehlende oder fehlerhafte Auskunft und Übermittlung zur Abwärme (Nummern 8 und 9).
Kind
Criminal Liability
Damage to Reputation
Exclusion from Procurement
Monetary Fine
Other
Other Prohibitions and Exclusions
Private Action
Prohibition of Sales
Public Disclosure
Rule set
Regulation-wide (no rule set)
Companies with an average annual total final energy consumption of more than 7.5 gigawatt hours
Companies with an average annual total final energy consumption of more than 2.5 gigawatt hours
Operators of data centres
Data centres that started operation before 1 July 2026
Data centres that start operation from 1 July 2026
Data centres with a non-redundant rated connected load of 1 megawatt and above
Operators of data centres offering services to third parties
Data centres owned by or operated for public bodies