| EED |
Owners and operators of data centres with an installed IT power demand of at least 500 kW |
Objects in
Data centre
|
| EED |
Data centres with a nominal total energy input of more than 1 MW |
Objects in
Data centre
|
| EnEfG |
Data centres that started operation before 1 July 2026 |
Objects in
Data centre
|
| EnEfG |
Data centres that start operation from 1 July 2026 |
Objects in
Data centre
|
| EnEfG |
Data centres with a non-redundant rated connected load of 1 megawatt and above |
Objects in
Data centre
|
| EnEfG |
Data centres owned by or operated for public bodies |
Objects in
Data centre
|